Kraken Subsea

Kraken Subsea

Oil and Gas

Glasgow, Glasgow 1,731 followers

The next step in Pre-Commissioning technology.

About us

Welcome to Kraken Subsea – the simpler, smarter solution for your Pre-commissioning equipment needs. Kraken Subsea is pushing the boundaries of what is possible in Pre-Commissioning by applying modern technology to add value to our products and to provide you with the results you need fast. We offer rental, service and maintenance solutions for a range of equipment packages including Pig Tracking, Free-Flood, Chemical Injection, Pressure Monitoring, Pressure Testing and Filtration Solutions.

Industry
Oil and Gas
Company size
2-10 employees
Headquarters
Glasgow, Glasgow
Type
Privately Held
Founded
2019
Specialties
Pre-Commissioning, Pressure Testing, Data Logging, Pig Tracking, Filtration, Filters, Chemical Injection, Free-Flooding, Global, North Sea, Houston , and Norway

Locations

Employees at Kraken Subsea

Updates

  • View organization page for Kraken Subsea, graphic

    1,731 followers

    Kraken’s Standalone Subsea Filtration Systems are completing flooding operations around the globe! Each filter is custom-designed for its specific task, ensuring full contingency to handle any unexpected events during the operation. Paired with a deployment frame, these systems are easy to install and recover, while also keeping the filtration unit elevated from the seabed. Whether the job requires a few hundred litres per minute or 20m³/min, Kraken has the experience to handle it all—and we're ready to do it again! Need reliable subsea filtration? Release the Kraken! 🐙

    • No alternative text description for this image
  • View organization page for Kraken Subsea, graphic

    1,731 followers

    Kraken’s Subsea Choke Manifold is diving into the ocean depths once again! This innovative system gives you precise control over pig speed during dewatering operation. With real-time flow rate monitoring and total volume display, you maintain full operational control. Its 21-day battery life and data logging capability ensure a reliable backup and operation record upon recovery. Pair it with our ROV-operated or fully automated subsea sampling system to capture the fluid subsea. The Choke Manifold’s unique design enables flow diversion at any stage of operation. Ready to take your subsea operations to the next level? Look no further! Release the Kraken!🐙

    • No alternative text description for this image
  • View organization page for Kraken Subsea, graphic

    1,731 followers

    Kraken surfaces! We’ve just completed a full pre-commissioning scope for the topside pipeline and infrastructure, powered by our innovative Kelpie System. This self-contained test cabin, featuring electrically driven pumps and fully automated, remotely operated valve manifolds, sets a new standard. Utilising site power connection significantly reduces CO2 emissions, and the system automation cuts crew size by 50% compared to traditional methods. In under 6 hours from setup, we achieved FCG, hydro testing, dewatering, and N2 packing in just 9 days. The future of topside pre-commissioning has arrived. Release the Kraken!🐙

  • View organization page for Kraken Subsea, graphic

    1,731 followers

    The ROV Kraken Subsea Sampling Skid is set for deployment once again! Crafted for seamless integration with divers and ROVs, our subsea sampling fleet guarantees a dependable and streamlined collection of samples from any subsea asset. Its adaptable modular design enables it to meet the specific requirements of any project. An ideal choice for pipeline pre-commissioning or decommissioning sampling applications. Get ready to dive into the depths of the ocean- Release The Kraken!🐙

  • View organization page for Kraken Subsea, graphic

    1,731 followers

    This is what pipeline flooding at an impressive rate of 20m3/min looks like! Kraken Subsea has undertaken the comprehensive design and construction of both the filtration unit and the lifting frame, enabling the seamless deployment and installation of the 3.5Te flooding cap at a depth of 2100m. Furthermore, our team modelled, designed, and integrated a flow control system to guarantee the precise execution of the flooding operation within the specified timeframe and flow rate. The entire operation was carried out successfully, meeting all requirements – signed, sealed, and delivered! With a proven track record of over 70 completed pipeline flooding operations globally, look no further – Release The Kraken!🐙

    • No alternative text description for this image

Similar pages

Browse jobs