Syblon Reid

Syblon Reid

Construction

Folsom, CA 1,389 followers

Providing Solutions to Difficult Projects

About us

Sybloln Reid has been "Providing Solutions to Difficult Projects" Since 1955 and is a recognized leader in challenging projects requiring a high technical skill level and problem solving abilities. We partner with our clients with a variety of delivery methods specific to their needs in water treatment, lift and pumping stations, underground, bridges, and environmental enhancements. Water and hydro conveyance systems include generation facilities, flumes, dams, tunnels, penstocks and valves. Difficult, challenging and adventurous projects are what we do!

Industry
Construction
Company size
51-200 employees
Headquarters
Folsom, CA
Type
Privately Held

Locations

Employees at Syblon Reid

Updates

  • View organization page for Syblon Reid, graphic

    1,389 followers

    Syblon Reid acknowl­edges the impact we have on the envi­ron­ment, our peo­ple, and local economies and rec­og­nize our role in sup­port­ing and advanc­ing the achieve­ment of the Unit­ed Nations Sus­tain­able Devel­op­ment Goals (SDGs), a frame­work to guide efforts by com­pa­nies, gov­ern­ments, and civ­il soci­ety to address the world’s most press­ing needs. You can learn more about Syblon Reid’s efforts in achiev­ing a more sus­tain­able future by viewing our ESG/Sustainability Plan on our website. #sustainabilitymatters #environmentalsustainability #syblonreid

    • No alternative text description for this image
  • View organization page for Syblon Reid, graphic

    1,389 followers

    This project was located along the mountainside of Kaweah Powerhouse No. 1. Phase I includ­ed the demo­li­tion and replace­ment of aging flume. Phase 2 was sim­i­lar to Phase 1 but includ­ed two sep­a­rate sites approx­i­mate­ly two miles apart and com­prised 2,726 LF and 519 LF, respec­tive­ly, with over 23,500 man hours worked in less than a 4-month peri­od. The Phase 2 work also required the instal­la­tion of a bypass sys­tem to allow the own­er to meet local water user deliv­ery requirements. Due to the iso­lat­ed loca­tion, the project required over 570 hours of heli­copter sup­port to remove mate­ri­als from the demo­li­tion oper­a­tion and bring in new mate­ri­als and equip­ment. Perched on steep ter­rain, the project also required crews to work from ropes and rap­pel ver­ti­cal rock faces to install the new foot­ings and bent sections. Syblon Reid spe­cial­izes in this type of work and has many years of expe­ri­ence on such projects.

    • No alternative text description for this image
  • View organization page for Syblon Reid, graphic

    1,389 followers

    Providing solutions to difficult projects since 1955, Syblon Reid is an employee-owned ESOP heavy civil contractor based in Folsom, California. We undertake a diverse array of multifaceted projects, from the construction of new facilities necessary to meet the needs of a growing population to the rehabilitation of historic and vital water conveyance and hydro generation facilities that helped build this nation. The Project Manager will manage all aspects of the construction management process and support business development, developing and maintaining client relationships and oversight and implementation of company policies and procedures. This position will provide technical direction and oversight with responsibility for the safety, costs, productivity, profitability, and overall quality of the work for the projects. To learn more and apply to this position and other available positions, go to our website srco.com/careers. #werehiring #werehiringnow #fresnoca #fresno #folsom #folsomca #constructionjobs #projectmanager #projectmanagerjobs

    • No alternative text description for this image
  • View organization page for Syblon Reid, graphic

    1,389 followers

    Syblon Reid was awarded a project for a northwest hydropower company in July 2023.  The team executed detailed planning for access, demolition, drilling, grouting, concrete placement, and water management. Access was primarily through the spillway intake structure, with a scaffold stair tower and temporary guardrails ensuring safety. For the inclined tunnel section, a traveling platform supported by hydraulic winches and accessed via a heavy-duty swing stage was employed. Drilling and grouting focused on water intrusion and reinforcing the substrate layer with cementitious and polyurethane grout injection. Demolition included radial saw cutting and selective removal of concrete using a remote-controlled hydraulic demolition machine. The project utilized a self-consolidating concrete mix to ensure smooth application and high-quality coverage. Custom-designed radial wood forms, anchored with coil rod anchors, were used to match the tunnel’s curvature. Concrete was pumped through ports on these forms using a line pump and tremie tubes, ensuring consistent distribution and avoiding segregation. This approach, combined with advanced formwork techniques, led to successful and efficient aerator system placement. Despite facing initial delays and a tight schedule, the project prioritized safety with zero loss-time incidents. The Contractor-designed access platform proved effective, and while drilling revealed substrate issues affecting stability, the team overcame challenges with innovative water control and demolition methods. The use of advanced concrete technology resulted in a high-quality finish and overall project success.

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • View organization page for Syblon Reid, graphic

    1,389 followers

    We’re proud to have played a key role in advancing sustainability at the Yolo County Central Landfill, just a few miles from Davis. Our team took on the construction of two critical components: 🔹 Liquid Food Processing Area: We handled everything from site clearing to subgrade prep, installing geotextiles, asphalt, and concrete pavement. We also added cast-in-place trench drains, a concrete pushwall, and a new HDPE manhole sump, while removing an old storm drainage sump. 🔹 Equalization Tank System: This involved installing a steel corrugated tank, a dual-purpose liquid agitation and routing system, and a pH adjustment system. We also set up grinder pumps, HDPE pipes, flowmeters, valves, and all the necessary instrumentation.

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • View organization page for Syblon Reid, graphic

    1,389 followers

    At Syblon Reid, we're committed to safeguarding our environment through cutting-edge treatment systems that tackle some of the toughest contaminants like hexavalent chromium, perchlorate, asbestos, arsenic, and more. Whether it’s surface water, acid mine drainage, or groundwater, our “pump and treat” methods ensure clean, safe water for all. Our deep-rooted commitment to environmental stewardship drives us beyond regulatory compliance—it's about making a lasting, positive impact. #EnvironmentalExcellence #WaterTreatment #SyblonReid #Sustainability #EnvironmentalStewardship

    • No alternative text description for this image
  • View organization page for Syblon Reid, graphic

    1,389 followers

    We’re proud to have partnered with Abide International, Inc. on the Fixed Wheel Gate Rehabilitation for the U.S. Bureau of Reclamation. Our team at Syblon Reid executed this project in two meticulous phases: 🔹 Phase 1: Site investigation & modification of stoplog screens for high water stoplog installation. 🔹 Phase 2: Rehabilitation & testing of stoplogs, including cleaning, coating, seal installation, rigging, and leakage testing. With careful planning and precision, we set the stage for the next phase at the top of the dam. #syblonreid #contractorservices #engineeringcontractors #generalengineering #constructionindustry #constructioncrew #folsomca #folsomdam

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • View organization page for Syblon Reid, graphic

    1,389 followers

    The Russian River Treatment Plant Disinfection Upgrade project consisted of construction of an ultraviolet (UV) light disinfection system at an existing wastewater treatment plant located in Guerneville, California. The scope of work encompassed the installation of a low pressure, high output UV disinfection system in a two-channel concrete basin; coagulation and flocculation facilities; a launder cover over an existing secondary clarifier; piping; electrical equipment; and other plant modifications. #syblonreid #contractorservices #engineeringcontractors #generalengineering #constructionindustry #constructioncrew #folsomca

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +1
  • View organization page for Syblon Reid, graphic

    1,389 followers

    Our experience in heavy civil mechanical projects include the installation of large water control valves (penstock shut-off, butterfly, Howell-Bunger/fixed-cone, spherical, etc.), self-cleaning fish screen systems, storage tanks, pump stations, water and wastewater treatment plant process systems, trashracks, mechanical raking systems with debris conveyors, filter systems, mechanical and yard piping, etc.; and the rehabilitation/repair of radial gates, drum gates, slide gates, low-level outlet gates, wheel gates, powerhouse pressure reducing valves, etc. #constructionengineeringwork #constructioncrew #constructionworker #civilcontractors #constructionproject #engineeringcontractors #generalengineering #constructionindustry

    • No alternative text description for this image
  • View organization page for Syblon Reid, graphic

    1,389 followers

    Every year, Syblon Reid responds to several emergencies for our clients.  These involve a variety of circumstances, including landslides, fire damage, and tunnel repairs.  One of these emergency tunnel repairs came from the California Department of Water Resources to rapidly and surgically remove a deteriorating baffle ring within the river outlet tunnel at the Oroville Lake Dam.  The baffle ring was located approximately a ½ mile inside the outlet tunnel underneath Lake Oroville. Syblon Reid worked around the clock from atop a 120-foot x 30-foot floating platform to remove 60 cubic yards of concrete.  The concrete above the waterline was chipped out and dropped directly onto the platform.  Submerged concrete sections had to be chipped out and placed by the divers into buckets lowered beneath the water so the material could be lifted out and placed onto the platform.  The barge would then move the platform out of the tunnel to a location where the concrete could be disposed of.  Additionally, the steel band that encircled the tunnel had to be cut out and removed. Once all concrete and steel were removed, the tunnel liner was repaired.  In addition to removal of the baffle ring, Syblon Reid built and installed a new pressure relief wall to protect the powerhouse from catastrophic failure of the low level outlet valves.  

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image

Similar pages

Browse jobs