AHMAD RAZA’s Post

View profile for AHMAD RAZA, graphic

Experienced HSE Engineer committed to creating and maintaining a safe work environment at Tata Power Solar System Pvt Ltd with 9 years of experience. Also ISO 45001;2018 Internal Auditor Completed. Nebosh IGC Completed.

Here are some basic safety precautions to take when installing ground mounted solar panels: Lifting and moving: Use at least two people to lift each solar panel, and consider using a forklift. Avoid sitting on the panels, stepping on them, or applying too much pressure, as this can break them or cause injury. Don't drop anything on the panels, and be careful of falling objects. Wearing proper equipment: Wear electrical hazard-rated boots with compression-resistant toes, flame-resistant clothes, gloves, and safety glasses. Avoiding bad weather: Stop working in bad weather conditions. Keeping the area clean: Make sure the area under the panels is clean and clear of foreign objects. Ensuring electrical connections are secure: Check that the system is grounded correctly and that all wiring is securely insulated. Hiring a licensed electrician: Hire a qualified and licensed electrician to install and maintain the system. "Solar energy, clean energy for a better tomorrow" , So be a Part of the Solar Family.

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics