Aurum Resources’ Post

View organization page for Aurum Resources, graphic

2,995 followers

We've reported further high-grade gold intercepts including 1m @ 163.42 g/t gold within 12m @14.56 g/t from step-back diamond hole at BD Target 1 as part of ongoing diamond drilling at our Boundiali Gold Project in Côte d'Ivoire, West Africa. The BD Target 1 is a 1.3km by 1km wide gold prospect within a 13km by 3km gold mineralised corridor. We will continue high tempo gold exploraton drilling with more than 30,000m of diamond drilling planned for this year, with a strong cash balance of approximately A$5M to support our aggressive exploration efforts. We are targeting an initial Mineral Resource Estimate for late CY2024. Managing Director Dr. Caigen Wang said: “We are very pleased to see this project best result for BD target 1 with DSDD0051 hitting 1m @ 163.42 g/t Au within an interval of 12.22m @ 14.56 g/t Au from 275m. This interval was 60m down dip from 4m @ 22.35 g/t Au (DSDD0004) and the system remains open as we systematically step out along strike and step back to test down dip. We will soon have four diamond drill rigs working at Boundiali as we increase our drilling rate to ~6,000m per month. We are in an incredibly target-rich environment as our geology team adds new targets to test at BD within the 13km by 3km gold corridor. We are leveraging the work completed by previous explorers at Boundiali and thanks to our supportive shareholders are well funded. Our aggressive drilling ensures consistent news flow as we build on the encouraging results to date from known targets on the BD and BM tenements and look forward to testing new targets whilst we aim to deliver inaugural JORC resources for Boundiali by late 2024.” Read the full ASX Announcement here: https://lnkd.in/gS6rNv-6 #AUE #Aurum #ASXNews #ASX #gold #westafrica #drilling #exploration #resources

  • No alternative text description for this image
Diomande Ibrahim Newton

Mine Geologist at ENDEAVOUR MINING ||Pit Mapping, Interpretation, Modelling, Grade control & Production||

3mo

Love this, very impressive. From my view point, when you get a deep look on that section, you'll clearly notice and see that the geometry of mineralized envelopps seems to constitute a structural system of tension gashes. It could also be in echelon in down dip. Never systematiquely stop drilling when interruption of ore intersection will be encountered. Just increase the spacing of deep or vey deep holes at that moment and keep eyes on survey. Congratulation to all the team, I sincerly believe and still believe in you. Keep going.

Well done Yaya Ouattara (MAusIMM) and our exploration team! Disclosure: I own DYOR

The structural model has just started, push the deep drilling to clearly define the model

Like
Reply
Mohamed . G.Y. Elhag

Senior Geologist @ Sudanese Minerals Resources Company | Resource & Reserve estimation | MSc Remote Sensing, GIS

3mo

Congratulations! I love that , kindly tell me some information about ore deposit type and country rock in this area. Thanks again for sharing valuable information about this project

Like
Reply
ABOUDRAMANE DOUMOUYA

Technicien Géologue/Opérateur Pétrolier

3mo

Hello Mr. Yaya Ouattara (MAusIMM), How to apply to Aurum Resources ?

Like
Reply

This is remarkable

Like
Reply
ABOUDRAMANE DOUMOUYA

Technicien Géologue/Opérateur Pétrolier

3mo

Great news!

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics