Successful land developers know how to manage risks especially those associated with the land itself. Unknown site characteristics, including those not readily visible, can quickly lead to construction cost escalation, schedule delays, and project failures that lead to conflict and litigation. It is imperative to identify at least these possible conditions that lead to construction cost overruns: 1. Shallow rock 2. Unsuitable “borrow” soils 3. Light-weight, organic, plastic clay, or moisture-sensitive soils 4. Undocumented filled areas 5. Shallow groundwater #construction #engineering #engineer #northcarolina #charlottenc #aboveandbeyond #geotechnicalengineering #investigation