Dateline Resources Limited’s Post

Dateline Resources Limited recently announced diamond drill results from two holes drilled into the North Pipe at the Colosseum mine, located in San Bernardino County, California, US. The two holes, the first to be drilled by Dateline at the North Pipe, were drilled to test for extensions of the mineralised zone and verify historical drill results undertaken in the late 1980’s prior to mine development. The data obtained will also be used in mine planning. When the Colosseum mine was operational in the late 1980’s and early 1990’s, the main focus was on the South Pipe, with only a relatively shallow pit developed at the North Pipe. At the time of closure in 1993 mining was suspended at the North Pipe with significant gold mineralisation in the base of the pit. Discover more: https://loom.ly/A6igrX4 #DatelineResources #DTR #ASX

To view or add a comment, sign in

Explore topics