Eastern Resources Limited Australia’s Post

#ASXNews FURTHER HIGH-GRADE LITHIUM DRILL INTERCEPTS LEPIDOLITE HILL PROJECT Eastern Resources Limited is pleased to announce further assay results from its maiden reverse circulation drilling program completed on the Lepidolite Hill Project in March 2024. The assay results from the first 15 drillholes has delivered exceptional results (ref ASX: EFE 21 March 2024). Assay results from the remaining 22 drill holes have now been received, and continues to demonstrate significant high-grade lithium mineralisation hosted by shallow lithium-bearing pegmatites along over 1 km of strike and extending to a minimum of 154m below surface. Drilling has intersected lithium mineralisation up to 31m in thickness at 0.86% Li2O (EFLHRC0023 67-98M). Individual 1 metre assays up to 3.87% Li2O (EFLHRC0002 51-56m) were returned. The latest set of assay results confirm the presence of lithium mineralisation throughout the Project with the majority of drill holes completed to date intersecting multiple lithium-bearing pegmatites at various depths. Most of the lithium appears to be related to petalite and/or spodumene mineralisation. These results are highlighted by returning multiple results in excess of 2% Li2O (refer to Table 1), with some intersections exceeding 3% Li2O. Read full announcement: https://lnkd.in/drZckGHv easternresources.com.au

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics