Mammoth’s commitment to the East Coast remains unwavering 🤝 We are fully equipped to support your next project with our locally stocked domestic line pipe and HDPE inventories and strategic relationships with East Coast coating plants like Liberty Coating Company, LLC and Midwest Pipe Coating Inc and Tier 1 mills like Dura-Bond Industries, Inc and Borusan Berg Pipe. It was awesome connecting our team with friends and partners on our recent journey through Pittsburgh, West Virginia, and the Carolinas and we thank you for your continued support! Trust Mammoth to keep your projects flowing seamlessly, coast to coast. 🦣 🌎 #MammothCarbon #EastCoast #IndustryDiversity #BuildingTheFuture #Linepipe #HDPE #MDPE #StructuralSteel #Piling #LOCAL #OilGas #USA
Mammoth Carbon Products, LLC’s Post
More Relevant Posts
-
Quickly paired, securely connected: BOMAG's new trench roller. 🚀 This new generation trench roller is the perfect choice when things get particularly challenging, confined or dangerous. With its operating weight of nearly 1.6 t, the new #BOMAG BMP 8500 multi-purpose compactor achieves outstanding #compaction results in trench, sewer and pipeline #construction. #BMP #BMP8500 #trenchroller #new
To view or add a comment, sign in
-
Discover the technical prowess of BSA in our blog! Learn how we managed epoxy grouting for a capital project expansion, overcoming cold weather challenges and site-specific considerations. With nearly 1" of precipitation the day before grouting, our expertise ensured a customized process for efficient pouring of Escoweld® 7505/7530 over three days. #EpoxyGrout #EpoxyGroutBlog #GroutBlog
CASE STUDY - Cold Weather Epoxy Grouting Three 752hp Pumps with Rain and High Wind Gusts -- Bill Spitzer & Associates
billspitzerassoc.com
To view or add a comment, sign in
-
The Superior Jetties LLP Polyethylene Superior Modular Dock Modules offer versatility, allowing them to be arranged in various configurations such as work platforms, pump pontoons, jetties, marinas, and floating walkways. These modules maintain consistent technical specifications, as detailed below.
To view or add a comment, sign in
-
SLUG CATCHER / INLET SEPARATOR - MUELLER MODEL KLS-1BSC Mueller Environmental has developed various ways to remove large liquid volumes from pipelines without the need for additional downstream separation while also accommodating footprint restrictions. Our KLS-1BSC submarine configuration is a highly versatile design available in a wide range of sizes enabling storage volumes up to 20,000 gallons per unit (96" ID x 50' L). It can be configured with appropriate ladders and platforms, and like all Mueller equipment is designed to meet the unique specifications of each installation. All Mueller KLS separators utilize the Helical Coil Technology, giving every design the same level of high efficiency separation and protection for downstream equipment. The popular KLS series is known for its reliability. In hundreds of installations in all conditions spanning over two decades of service, no KLS unit has ever failed. KLS slug catchers can also be used in tandem with the Mueller Mist Elimination Waste Tank vessels to allow even faster dumping vessels to allow even faster dumping. ✔ KLS SLUG CATCHER ADVANTAGES • Highly versatile, accommodating a wide range of liquid volumes • Eliminates need for additional downstream separation • Significantly reduces maintenance costs (no replacement filters or moving parts) • Proven to handle heavy liquid loads while maintaining high separation efficiency • Significantly increases throughput (no downtime for filter changes) • Exceptional track record: No KLS has ever failed #MuellerEnvironmentalDesigns #ProvenUnderPressure #BuiltToLast #MUELLERmodel #EngineeredToPerform #PatentedTechnology
To view or add a comment, sign in
-
📸 Actual operation at Grande Prairie, AB In the frac sand transloading industry Delays in loading or unloading can disrupt supply chains and escalate costs. The Schnell Transloader provides the solution you need offering high-speed, precision-engineered conveyor systems. It significantly increases throughput, reducing downtime and wait times for trucks and railcars. Its robust but smooth handling design preserves the integrity of the frac sand, ensuring that the product remains high-quality from start to finish. Schnell not only enhances operational efficiency but also protects your frac sand investment, offering a streamlined solution to optimize your transloading process and maximize profitability. #fracsand #transloading #schnellindustries
To view or add a comment, sign in
-
Adapted To Fit// This is a custom made "stack" tank, that will be delivered to our client's facility in the state's north. The facility is a wet plant where garnet rich sand is delivered from a mine site. Then through the use of water and centrifugal forces, they separate the garnet from lighter waste minerals, leaving a garnet concentrate for abrasive blasting. Water is a crucial element in this process, and our client needed another tank to hold 25,000L, but the dilemma is that space is limited. To create a tank that could solve this problem, we made two modified 14,000L tanks that our fabrication team then took and modified further to be able to vertically stack together, without any loss of structural integrity. This reduced the physical footprint of the tank, fitting into the limited floor space while still maintaining a large enough capacity for our client. To read more about this case study head to: https://bit.ly/4aq3tjz To learn more about our water storage tanks head to: https://bit.ly/3IhEqmo
To view or add a comment, sign in
-
ENECON solves Florida cement factory's diesel containment challenge. Failed coating replaced with ENECLAD FPS, chosen for its excellent diesel resistance. Surface prepared via grit blasting and power washing. ENECLAD CFS primer applied, followed by two ENECLAD FPS coats. Result: Fast, cost-effective, proven protection for concrete. #IndustrialCoating #ConcreteProtection #DieselContainment #ENECLADSolution #InfrastructureMaintenance #ChemicalResistance #CementIndustry https://bit.ly/42GhuFq REPAIR - DON'T REPLACE!
To view or add a comment, sign in
-
DetaPipe™ fills a significant void in reactive metal pipe supply options. Whether for new construction, repair, or upgrades, read how our supply chain management of clad pipe addresses the need for tight delivery timelines. #DetaPipe #Supplychain #DetaClad #PipeSupply https://ow.ly/hqp550QzMJf
To view or add a comment, sign in
-
Over the past two years, I’ve had the privilege of watching our team’s hard work drive the growth of our fabrication division, as well as our expansion into field maintenance, vessel, and fire tube repair. This progress reflects not just our dedication but the resilience and innovation of the entire energy industry. Canada continues to lead the way in producing some of the cleanest energy in the world, supported by some of the strictest environmental regulations. While the global push for alternative energy is important, it’s essential to recognize that fossil fuels remain a crucial part of the energy mix. Rather than relying on imports from regions with less stringent standards, we should champion Canada’s cleaner, homegrown solutions. The fact is, alternative energy isn’t yet capable of fully replacing fossil fuels. Limiting our domestic energy industry only encourages dependence on less regulated, external sources. It’s time to support Canadian energy and the responsible practices that make us a global leader. #CanadianEnergy #CleanEnergy #SupportLocal #EnergyIndustry #SustainableFuture #EnvironmentalResponsibility
Precision, strength and reliability in every weld! This little pigging skid is off to its new home! From concept to completion, Prefurd is committed to delivering high-quality solutions for the energy industry! #PREFURD #piggingskid #oilfield #customfabrication #thislittlepiggie #stickwelding
To view or add a comment, sign in
-
Professional engineer providing project management, geotechnical & construction materials testing, retaining wall design, failure analysis, and wall repair consulting services.
Now here's something you don't see everyday. If you've been in construction long enough, you may have seen roof top units (RTU's) lifted and placed on top of large buildings via helicopter, when bringing in a crane capable of making that lift is just not practical. You may have seen concrete placed via bucket on the end of a crane. However, I have never before seen concrete placed via helicopter. Is this called helicrete? 🚁 ❓ Here's how you place 70 cubic yards of concrete, one cubic yard bucket load at a time. Good thing they brought two buckets. #construction #safety #innovation #meansandmethods #concretesupply #concreteplacement #concretetesting
Here you go, folks! Concrete placement via helicopter. When neither the delivery truck nor a pump truck can safely get reasonably close to the location of placement, this is how the experts at Doppelmayr USA get it done! The Highlands will have a new Interconnect Lift this season, with concrete delivered by Team Elmer's and tested by our own technicians. #concrete #qualitycontrol #qualityassurance #civilengineering #materialstesting #testingservices
To view or add a comment, sign in
2,060 followers