Part of the role of a Wireline Engineer
Manuel Fuentes’ Post
More Relevant Posts
-
Undergraduate Geologist Student | Passionate About Earth Science | Eager To learn And Grow In The Field. #SpecialGeology.⚒️🛢️👷🏻♂️
Wireline Logging🛢️🔥
To view or add a comment, sign in
-
essential as part of layout planning and equipment seating is concern especially for mini WHP or LWS where limited foot print
Petroleum engineering student ||production and reservoir engineering ||Data science learner ||Future Designer Club member
Wireline operations
To view or add a comment, sign in
-
The conventional solution for saturation logging jobs involved hoisting heavy wireline equipment to the platform, but the physical infrastructure of the rig couldn’t support the weight, to say nothing of the high costs associated with wireline. https://lnkd.in/g5tqzQz3
To view or add a comment, sign in
-
wireline operation - tools & equipment
Petroleum engineering student ||production and reservoir engineering ||Data science learner ||Future Designer Club member
Wireline operations
To view or add a comment, sign in
-
NESR Wireline logging - ZB-179 Sigma-CO operation ( Saturation Log)
To view or add a comment, sign in
Representante de Ingenieria y Ventas en Tucker Energy Services de Venezuela
10moNo te duermas... come Chimuuu