Mid-week our field teams across California, Arizona and Colorado, on a couple hundred active Murray Company projects, discussed “Covers for Holes". This was the important topic on the menu that day as part of OSHA’s National Safety Stand Down campaign to prevent falls in construction. Wednesday’s Featured Projects: Hyperion Wastewater Treatment Plant – Playa Del Rey, CA AMAT Campus – Sunnyvale, CA Midfield Satellite Concourse (MSC) South – Los Angeles, CA #Safety #safety247 #nationalsafetystanddown #coversforholes #preventfallsinconstruction #weloveourpeople #gohomesafe #dontbeastatistic #norcal #socal #bayarea #constructionsafetyweek #california #arizona #nevada #colorado #fullservicecontractor
Murray Company’s Post
More Relevant Posts
-
Looks like George Straight is happy that StormArc is the next generation of stormwater management #goodflowsolutions #stormarc #underground #stormwater #systems #undergroundconstruction #precast #precastconcrete #stormwatermanagement #undergroundutilities #water #watermanagement #retention #detention #system #goodflow
To view or add a comment, sign in
-
The PaveDrain system was used for the parking lot at Shoreview Water Treatment in Shoreview, MN. Do you have a project that the PaveDrain system could replace your tired, existing stormwater practices? Grab the link in the first comment to learn more! #permeablepaving #greeninfrastructure #stormwater #civilengineering #pavedrain
To view or add a comment, sign in
-
Word is spreading that our StormArc system is the next generation of stormwater management. #goodflowsolutions #stormarc #underground #stormwater #systems #undergroundconstruction #precast #precastconcrete #stormwatermanagement #undergroundutilities #water #watermanagement #retention #detention #system
To view or add a comment, sign in
-
San Antonio | Bexar County Stormwater Requirements Bexar County, which includes the city of San Antonio, sits on top of the Edwards Aquifer. Edwards provides drinking water to Bexar County, so special attention is placed on stormwater quality in this region of the state. The aquifer is recharged with rainwater. So it makes sense that extra attention is placed on filtering that rainwater to a higher standard as it will eventually percolate to the aquifer below. To that end, the list of approved treatment BMPs (Best Management Practices) is rather small and includes the Austin Sand Filter as well as a select few end-of-pipe multi-stage treatment systems, as well as batch ponds. The choice of the system employed is decided by the P.E. during the design phase, but maintenance and permitting are the responsibility of the owner. After construction, the P.E. will provide certification that the BMP(s) are in place and functioning properly. Additionally, a record of maintenance affidavit will need to be recorded and a certified maintenance provider will need to be identified. Submittal of these documents will trigger a review by the county to verify that the system is in place and the documents submitted are valid. Check out what maintenance and permit documentation is needed in Bexar County on our website, the link is in the comments! #stormwater #civilengineering #stormwaterprofessionalsgroup #texas #detentionpond #propertymanagement
To view or add a comment, sign in
-
📣ICYMI: Chicago Reader - In 1892, officials hired construction crews to create canal locks. They also dredged, deepened, and widened the river—which emptied into an entirely new canal called the Chicago Sanitary and Ship Canal—to reverse its flow. Since then, the Metropolitan Water Reclamation District (MWRD) can be credited with most of the river’s cleanup. Even after the river’s reversal, Chicagoans continued to dump waste into the river, so the MWRD installed additional sewer pipes to divert wastewater away from the river. Since the 1990s, the district has been working on the Tunnel and Reservoir Plan(TARP), a deep tunnel system that forces rainwater to water reclamation plants, where it’s cleaned before being released. Today, the river isn’t perfect. The bottom of Bubbly Creek still contains metal contaminants and industrial chemicals. Nevertheless, it’s resilient. In 2022, scientists at Shedd Aquarium found the south branch had more diverse fish species than anywhere else in the Chicago River. 📰 https://lnkd.in/duEd4gTc ➡️ https://lnkd.in/dRwC97wm #MWRD #CookCounty #Chicago #ChicagoReader #StormwaterManagement #WastewaterTreatment Chicago Reader
To view or add a comment, sign in
-
Storm System Cleaning Have you received notice from a governing entity concerning your Stormwater Quality permit and don’t really know what the right next step is? Contact us today and we will get a copy of your SWQMP for you at no charge. Additionally, we will schedule some time to go over the plan with you and explain the requirements and cost associated with them. Our storm drain cleaning and stormwater maintenance experts think that with the right information in hand, our customers can feel confident that they are not performing (and paying for) unnecessary, costly maintenance. If you’re the type who doesn’t really care how the watch is made, you just want to know what time it is, then our compliance and storm drain cleaning experts can do that too. And while we appreciate the trust, we provide all manifests and documentation for your records so that you can rest assured that your compliance is our main goal. https://lnkd.in/eevE5mka #stormwater #civilengineering #stormwaterprofessionalsgroup #harriscounty #houston
To view or add a comment, sign in
-
The PaveDrain system was used for the parking lot at Twin Peaks in Doral, FL. This project used 1,831 square feet of grey PaveDrain blocks. Do you have a project that the PaveDrain system could replace your tired, existing stormwater practices? See how PaveDrain can help! Link in the comments. #permeablepaving #greeninfrastructure #stormwater #civilengineering #pavedrain
To view or add a comment, sign in
-
This week, we're shining a spotlight on our Fayetteville, WV project for American Electric Power (AEP)! Our crews are hard at work placing and compacting the initial backfill soil to the achieve subgrade. Why is proper soil compaction crucial? Proper soil compaction is essential for the stability and longevity of the substation. It prevents settlement and shifting that could compromise the structure's integrity. Without adequate compaction, we risk: - Foundation Failure: Leading to costly repairs or even complete rebuilds. - Water Damage: Poorly compacted soil can lead to water pooling and erosion. - Safety Hazards: Unstable ground can create dangerous working conditions for crews and future maintenance teams. Watch for more updates on this exciting project and many others! #CooksExcavating #ConstructionExcellence #AEPSubstation #FayettevilleWV #EnvironmentalCompliance #BuildWithTheBest
To view or add a comment, sign in
-
PaveDrain is the highest performing permeable pavement
PaveDrain was used in this parking lot of the Somerset Trust Company in Greensburg, PA. PaveDrain is a great option to reduce stormwater runoff in parking lots, and can be used in conjunction with other types of pavements. #permeablepaving #greeninfrastructure #stormwater #civilengineering #pavedrain
To view or add a comment, sign in
-
Though the word innovative might not be entirely accurate, the town of Prescott Valley has received a grant to tackle a huge challenge in desert climates. The project will look to capture runoff from rooftops in infiltration trenches to recharge the aquifer that numerous residents rely on for their wells. The completed a pilot project to study the prospects of this program nearly 5-years ago and found great results: https://buff.ly/3KwyNSo The lessons learned sections highlights one of the most forgot parts of capturing runoff and infiltrating it, providing and maintaining adequate pre-treatment. #stormwatermanagement #civilengineer
May 30, 2024: Town Receives Grant for Innovative Rainwater Harvesting Project | Prescott Valley, AZ - Official Website
prescottvalley-az.gov
To view or add a comment, sign in
8,617 followers
Technician at Aqua Backflow & Chlorination, Inc.
4moI just chlorinate 22 story building in Los Angeles & the Murray team is always professional, safe and easy to work with. Can’t wait to do more projects with the Murray team