Oil Gas Technology’s Post

View organization page for Oil Gas Technology, graphic

2,121 followers

Capable of producing up to 550 million standard cubic feet per day (mmsfd), this project is poised to address the increasing global energy demand.  uk.pli-petronas.com Jerun Platform PETRONAS announced that the Jerun field in Block SK 408 located approximately 160 km off the coast of Sarawak, offshore Malaysia has recently achieved its first gas production. The operator of this block, Sapura OMV Upstream (Sarawak) Inc. (SapuraOMV) holds 40 percent participating interest, while the remaining 60 percent is equally shared by PETRONAS Carigali Sdn Bhd (PCSB) and Sarawak Shell Berhad (SSB) The Jerun field was first discovered in 2015 by SapuraOMV, following the drilling of nine exploration wells from 2014 to 2015. Capable of producing up to 550 million standard cubic feet per day (mmsfd), this project is poised to address the increasing global energy demand. PETRONAS Senior Vice President of Malaysia Petroleum Management (MPM), Datuk Ir. Bacho Pilong, said, "Congratulations to

JERUN FIELD ACHIEVES FIRST GAS PRODUCTION TO BOOST MALAYSIA'S ENERGY SUPPLY

JERUN FIELD ACHIEVES FIRST GAS PRODUCTION TO BOOST MALAYSIA'S ENERGY SUPPLY

oilgastechnology.com

To view or add a comment, sign in

Explore topics