Flooding is a major ground risk in tunnel construction, as unexpected water ingress can destabilise excavation, delay progress, and endanger safety. Thorough ground investigation is essential to identify groundwater levels and potential water-bearing zones, allowing engineers to plan effective water control measures and reduce the risk of flooding. Probing ahead of the tunnel face is also a reliable method to detect potential water before excavation, enabling timely adjustments to tunnelling methods. Follow us at Tunnel Engineering #flooding #tunnelflood #tunnelcollapse #tunnelcourse #tunnellingcourse #tunnellingpage #tunelfuturistico #tunelizacion #tunelfuturistico #tunnelengineering #safety #tunnel #tunnel #tunnelling #tunneling #tunel #civilengineering #miningengineering #learntunnelling #geotechnicalengineering #geologist #undergroundconstruction #undergroundspace #undergroundproject #tunellingtechnique #tuneldeviento #tünel #túnel #tunneleducation
Experienced a lot of such disasters. Flooding in non-binding soil formations or solid rock formations, both variants are dangerous..But the first variant causes even more damage..the incoming groundwater takes the loose soil formations with it and causes huge cavities, the tunnel lining is destroyed, cavities have to be laboriously filled. Therefore, geological and hydrological investigations as well as a thorough risk analysis are absolutely necessary before project planning.
We successfully recorded this video, showcasing our triumph over containing water in one place. I'm proud to announce that my team expertly managed this complex challenge within 3 months, additionally excavating a 7-meter tunnel despite adverse conditions. Regrettably, the project was closed for some time due to administrative reasons. NTPC Limited
Absolutely, probing is critical in tunneling to assess the conditions behind the tunnel face. It provides valuable information about geological features, groundwater conditions, and potential hazards such as voids, fractures, or weak zones. By gaining an understanding of what lies ahead, engineers can make informed decisions to adjust excavation methods, support systems, and safety measures, ultimately ensuring the stability and safety of the tunneling operation.
Les inondations sont un risque majeur pour la construction de tunnels, car des infiltrations d’eau inattendues peuvent déstabiliser l’excavation, retarder l’avancement et mettre en danger la sécurité. Une étude approfondie du sol est essentielle pour identifier les niveaux des eaux souterraines et les zones hydrographiques potentielles, ce qui permet aux ingénieurs de planifier des mesures efficaces de contrôle de l’eau et de réduire le risque d’inondation. Le sondage en amont de la taille du tunnel est également une méthode fiable pour détecter l’eau potentielle avant l’excavation, ce qui permet d’ajuster en temps opportun les méthodes de creusement des tunnels.
Tunnel. Engineering. . Cuando se producen las inundaciones inesperadas, en la construcción de túneles; constituyen un riesgo potencial de desestabilización. Planificar, y tomar medidas preventivas, como ( en el Mochito Mine) las “Estaciones de Bombeo” resultan efectivas, para el adecuado control, La detección oportuna ,antes de la excavación. Este video, nos muestra el peligro inminente, de las inundaciones durante la excavacion
I can't imagine the fear going through there heads.
I think to prevent tunnel flooding, start with a detailed ground survey to find and avoid water zones. Use grouting to seal cracks and install drainage systems to control groundwater. Keep checking water levels during construction to make quick adjustments if needed.
The problem is only one geotechnical and surveying are like sun and moon two in one whit same condition " no budget and very low consideration at site job" that is the problem
What about studying the dynamics of water level.I mean water is dynamic in nature,knowing recharging zone previous to tunneling might help.