We are thrilled to be part of another of Castell Group latest developments! Our Civil Engineering team has successfully submitted the SAB application for the site, alongside S185, S278, and S104 submissions to the local authority. In addition, our Structural Engineering team is currently working on the substructure design, including foundations, ground floor suspended slabs, and associated retaining wall designs. Civil Engineering Team: Hannah Thomas, Paul Graham, Robin Powell and Lewis Tumelty Structural Engineering Team: Rina Hashemi, Jon Mathias and Ashley James #ValeConsultancy #CivilEngineering #StructuralEngineering #Consultancy #Engineering #Development #Sustainable #SAB #Highways
Demolition has started at Moat Farm, a 7-unit site we’re delivering for our client, Newydd Housing Association . The design of this scheme is distinct from our typical developments, as it has been tailored to align with the character of the local area. The site will feature aluminium standing seam roofs, vertical cladding, and open timber-effect louvres, creating a contemporary look that complements the surroundings. This project has presented some logistical challenges due to site constraints, requiring careful planning of vehicle sizes and delivery schedules. However, we are excited to see this scheme come to life. This scheme is supported by funding from the Llywodraeth Cymru / Welsh Government and the Vale of Glamorgan Council, reflecting a shared commitment to delivering high-quality, affordable housing for local communities. We are actively seeking new land opportunities to support future developments. Our land criteria are as follows: -Brownfield or greenfield sites. -Preferably within settlement boundaries, though allocated sites will be considered. -Between 0.5 and 3 acres. -Sustainable areas within 1.5 hours of Swansea. If you have opportunities or know someone who does, please get in touch: https://lnkd.in/eWQYMBDM