Progress on the historical Colonial Parkway Rehabilitation in Williamsburg, VA! Teams are continuing construction on the concrete pavement and structural restorations throughout the project. Pavement demolition and stabilized subbase activities are also continuing at multiple locations within the parkway. #WagmanProject#construction
National Manager ALD Expert Demo | Director Revert Group Pty Ltd
Another Stair Removal and Infill project to add to our portfolio. This impressive spiral staircase connected Levels 3 to 6 within 737 Bourke St, Docklands. As part of a back to base initiative, we successfully removed two portions of the stair between levels 4 and 6. The infill of these two voids utilised overhead working platforms to ensure no damage was caused to the architectural finishes of the retained stair portion.
In close collaboration with the team at VEMI,
we delivered the demolition work as well as the infill components of this project. Despite a tight programme and a challenging construction methodology, the project has been a great success in meeting all deliverables.
Massive appreciation toward all the key parties involved in delivering this project including our team and contractors.
3-point AustraliaVemi ALD Expert DemoWillis Wai Yan LinDeepak Serchan#StairRemoval#Fitout#Refurbishment#MakeGood#Demolition#ArchitecturalStairs
There’s quite a drop on the far side of this universal column retaining wall (as you can see from the 7m markings currently above ground on the near side!)
The timber lagging is being cut and installed before we build the formation for the #Railway up and reinstate the track.
#NAL#CivilEngineering#Construction#GeotechnicalEngineering#Rail
Selective demolition is a great option for buildings such as 1200 Bay St., which are structurally sound but need to be renovated or repurposed.
Selective demo allows for the removal of unwanted materials while ensuring that the remaining structure is left intact, and key elements undisturbed.
Selective demolition can require careful planning, cutting-edge engineering, and a detailed plan before execution.
Our 30+ yrs of demolition experience can make a big difference to your bottom line. 🔶 Give us a call, in an ever changing market, we are your partner in progress 1 (800) 263-2076.
#demolition#plan#engineeredsolutions#experience#precision#innovativesolutions#yourpartnerinsuccess#priestlydemolition
How much water would you imagine could come down this little stream?
💧
Well, the scruffy dome on top of this new culvert (above the wing walls and rip-rap halfway up the rebuilt KiwiRail North Auckland Line embankment) gives an indication of how different this picture can look in a storm!