Copperbelt Katanga Mining

Copperbelt Katanga Mining

Mining

Lubumbashi, Haut Katanga 120,378 followers

AFRICAN COPPERBELT’S TOP MINING NEWS, TENDERS & OTHER RELATED ITEMS

About us

Copperbelt Katanga Mining is one of the leading online mining news publishers for the Central African Copperbelt. distributed via four digital platforms in Haut Katanga province of the Democratic Republic of Congo, and the Copperbelt and North-western provinces of Zambia. Our mining news platforms are accessed, seen and read by an audience of more than 101,000 LinkedIn followers besides over 56,000 CKM Newsletter Subscribers that includes influential mining authorities and key decision makers in the mining industry across the globe. Our four digital platforms includes; CKM Newsletter, CKM Website, CKM HTML Mailers and CKM eMagazine that reach the mining sector in the DRC and Zambia, plus over 17,000 followers on Facebook from 3 pages and many more on twitter and Instagram.

Industry
Mining
Company size
51-200 employees
Headquarters
Lubumbashi, Haut Katanga
Type
Partnership
Founded
2019

Locations

Employees at Copperbelt Katanga Mining

Updates

  • View organization page for Copperbelt Katanga Mining, graphic

    120,378 followers

    On October 16, the headquarters of Caixa Social de Catoca was inaugurated, an event that was attended by representatives of the Ministry of Mineral Resources, Oil and Gas, Endiama EP, and the senior management of Sociedade Mineira de Catoca, as well as individuals from the diamond subsector and guests. The Social Fund of Catoca will function as a complementary social protection mechanism, aiming to meet the most pressing needs of workers and former workers, especially in matters related to housing, health, microcredits and others. It represents an achievement that reflects the commitment of the General Directorate of Catoca, led by Dr. Benedito Paulo Manuel, with the commitment to the well-being of the worker of Catoca and their dependents, in favor of an increasingly better future for all.

    Foi inaugurada no dia , 16 de Outubro, a sede da Caixa Social de Catoca, um evento que contou com a presença de representantes do Ministério dos Recursos Minerais, Petróleo e Gás, da Endiama EP, e da alta gestão da Sociedade Mineira de Catoca, bem como de individualidades do subsector dos diamantes e convidados. A Caixa Social de Catoca vai funcionar como um mecanismo complementar de protecção social, visando acudir as necessidades mais prementes dos trabalhadores e ex-trabalhadores, sobretudo em questões relacionadas com habitação, saúde, microcréditos e outras. Ela representa uma conquista que traduz o compromisso da Direcção Geral de Catoca, liderada pelo Dr. Benedito Paulo Manuel, com o compromisso com o bem-estar do trabalhador de Catoca e os seus dependentes, em prol de um futuro cada vez melhor para todos. #CaixaSocialCatoca #DesenvolvimentoComunitário #ApoioSocial #Reforma

  • View organization page for Copperbelt Katanga Mining, graphic

    120,378 followers

    Impressive parameters of the iSeries Rotary Drills from Sandvik Experience the next generation of surface drilling technology with the iSeries family of rotary blasthole drill rigs. These automation-capable drills are designed to meet your evolving needs and offer unparalleled performance and versatility. Key Features: • Customization: Choose from diesel or electric versions to suit your specific requirements and environmental goals. • Advanced Automation: Streamline operations with automated functions and an intuitive user interface, ensuring a consistent operator experience across the entire iSeries range. • Intelligent Control: The Sandvik Intelligent Control System Architecture (SICA) provides real-time machine performance, health, and drilling efficiency feedback. • Data-Driven Insights: Leverage SICA's tools for drill planning, reporting, and analysis to optimize operations and ensure consistent hole-to-hole quality. With the iSeries, you're investing in a future-proof solution that delivers exceptional productivity, efficiency, and reliability.

    iSeries Rotary Drills from Sandvik Experience the next generation of surface drilling technology with the iSeries family of rotary blasthole drill rigs. These automation-capable drills are designed to meet your evolving needs and offer unparalleled performance and versatility. Key Features: • Customization: Choose from diesel or electric versions to suit your specific requirements and environmental goals. • Advanced Automation: Streamline operations with automated functions and an intuitive user interface, ensuring a consistent operator experience across the entire iSeries range. • Intelligent Control: The Sandvik Intelligent Control System Architecture (SICA) provides real-time machine performance, health, and drilling efficiency feedback. • Data-Driven Insights: Leverage SICA's tools for drill planning, reporting, and analysis to optimize operations and ensure consistent hole-to-hole quality. With the iSeries, you're investing in a future-proof solution that delivers exceptional productivity, efficiency, and reliability. Ready to learn more? Visit our website to explore the iSeries in detail and discover how it can transform your drilling operations: https://go.sandvik/1Gg #rotary-drilling #mining #technology #automation #iSeries

    • No alternative text description for this image
  • View organization page for Copperbelt Katanga Mining, graphic

    120,378 followers

    FlashBack | ⏪ #Retro Back in pictures: the Minister of Mines, Kizito PAKABOMBA, inaugurated the first conference on mining, energy and infrastructure in Maniema. In his opening remarks, His Excellency reaffirmed the Government's commitment to the development of the mining sector. He stressed that this conference is in line with the vision of the Head of State, who wants natural resources to truly benefit the Congolese population. The Minister highlighted the importance of reforms aimed at strengthening transparency in the sector in order to attract quality investments. He also highlighted the opportunities offered by Maniema's mining sector, which can boost the local economy, create jobs and improve the living conditions of residents. However, this requires strong infrastructure and reliable energy.

    #FlashBack | #Retro⏪ 𝗥𝗲𝘁𝗼𝘂𝗿 𝗲𝗻 𝗶𝗺𝗮𝗴𝗲𝘀 : le Ministre des Mines, Kizito PAKABOMBA, a inauguré la première conférence sur les mines, l'énergie et les infrastructures au Maniema. Dans son discours d'ouverture, son Excellence a réaffirmé l'engagement du gouvernement envers le développement du secteur minier. Il a souligné que cette conférence s'inscrit dans la vision du Chef de l'État, qui souhaite que les ressources naturelles profitent réellement à la population congolaise. Le Ministre a mis en avant l’importance des réformes visant à renforcer la transparence dans le secteur afin d'attirer des investissements de qualité. Il a également insisté sur les opportunités offertes par le secteur minier du Maniema, qui peuvent stimuler l'économie locale, créer des emplois et améliorer les conditions de vie des habitants. Cela nécessite toutefois des infrastructures solides et une énergie fiable. #CellComMINES

  • View organization page for Copperbelt Katanga Mining, graphic

    120,378 followers

    Milagros Rosal Avila writes about Teamwork 🤜🏽🤛🏽 ✨ Recently, I had the opportunity to observe the plant shutdown at Sentinel mine, an experience that not only highlighted the importance of technical planning and execution but also the power of teamwork. One of the most significant moments was my interaction with Mr. Sunday Simwawa the Milling Coordinator from Operations. With over 20 years of experience, he took the time to talk, explain, and share his knowledge. His willingness to collaborate reflects not only his leadership but also his commitment to the idea that engineering and operations work together toward the same goal. It’s common to think that engineering and operations have different objectives. However, experiences like this remind me that we are one team. We all play a crucial role in the chain, and it’s essential that our leaders show through actions that every one of us counts in the collective success. Thank you to everyone who was part of this experience, and especially to Mr. Sunday Simwawa for showing us that when we work together, the results are greater!

    ✨ Teamwork 🤜🏽🤛🏽 ✨ Recently, I had the opportunity to observe the plant shutdown at Sentinel mine, an experience that not only highlighted the importance of technical planning and execution but also the power of teamwork. One of the most significant moments was my interaction with Mr. Sunday Simwawa the Milling Coordinator from Operations. With over 20 years of experience, he took the time to talk, explain, and share his knowledge. His willingness to collaborate reflects not only his leadership but also his commitment to the idea that engineering and operations work together toward the same goal. It’s common to think that engineering and operations have different objectives. However, experiences like this remind me that we are one team. We all play a crucial role in the chain, and it’s essential that our leaders show through actions that every one of us counts in the collective success. Thank you to everyone who was part of this experience, and especially to Mr. Sunday Simwawa for showing us that when we work together, the results are greater! #Teamwork #Leadership #PlantShutdown #Engineering #Operations #Mining #Collaboration

    • No alternative text description for this image
  • View organization page for Copperbelt Katanga Mining, graphic

    120,378 followers

    Alfonso Lozada Pérez writes; 👷♂️ The basic objectives of extraction planning in a open pit mine are: ✅ To mine the ore body in such a way that for each year the cost to produce a Kg of metal is minimum, the philosophy of mining the “next best” ore in sequence. ✅ To maintain operation viability within the plan through the incorporation of adequate equipment operating room, haulage access to each active bench, road drainage, good roads and ramps, a good maintenance of equipment's, etc. ✅ To incorporate sufficient exposed ore “insurance” so as to counter the possibility of mis-estimation of ore tonnages and grades in the reserve model. This is particularly true in the early years which are so critical to economic success. ✅ To defer waste stripping requirement, as much as possible, and yet provide a relatively smooth equipment and manpower build up. ✅ To develop a logical and easily achievable start up schedule with due recognition to manpower training, pioneering activities, equipment deployment, infrastructure and logistical support, thus minimizing the risk of delaying the initiation of positive cash flow from the venture. ✅ To maximize design pit slope angles in response to adequate geotechnical investigations, and yet through careful planning minimize the adverse impacts of any slope instability, should it occur. ✅ To properly examine the economic merits of alternative ore production rate and cutoff grade scenarios. ✅ To thoroughly subject the proposed mining strategy, equipment selection, and mine development plan to “what if” contingency planning, before a commitment to proceed is made.            📜 Reference: W. Hustrulid, M. Kuchta & R. Martin, Open pit mine planning & design Vol.1 Fundamentals, CRC Press.

    View profile for Alfonso Lozada Pérez, graphic

    Mining Metallurgy Engineering 👷 Geostatistics 🏔 Mining Planning ⛏ Data Analysis 📊 Project Engineering 🏁 BI Analysis 📈

    👷♂️ The basic objectives of extraction planning in a open pit mine are: ✅ To mine the ore body in such a way that for each year the cost to produce a Kg of metal is minimum, the philosophy of mining the “next best” ore in sequence. ✅ To maintain operation viability within the plan through the incorporation of adequate equipment operating room, haulage access to each active bench, road drainage, good roads and ramps, a good maintenance of equipment's, etc. ✅ To incorporate sufficient exposed ore “insurance” so as to counter the possibility of mis-estimation of ore tonnages and grades in the reserve model. This is particularly true in the early years which are so critical to economic success. ✅ To defer waste stripping requirement, as much as possible, and yet provide a relatively smooth equipment and manpower build up. ✅ To develop a logical and easily achievable start up schedule with due recognition to manpower training, pioneering activities, equipment deployment, infrastructure and logistical support, thus minimizing the risk of delaying the initiation of positive cash flow from the venture. ✅ To maximize design pit slope angles in response to adequate geotechnical investigations, and yet through careful planning minimize the adverse impacts of any slope instability, should it occur. ✅ To properly examine the economic merits of alternative ore production rate and cutoff grade scenarios. ✅ To thoroughly subject the proposed mining strategy, equipment selection, and mine development plan to “what if” contingency planning, before a commitment to proceed is made.            📜 Reference: W. Hustrulid, M. Kuchta & R. Martin, Open pit mine planning & design Vol.1 Fundamentals, CRC Press. #mining #planning #openpit #geology #ore #orebody

    • No alternative text description for this image
  • View organization page for Copperbelt Katanga Mining, graphic

    120,378 followers

    Cobalt Infographic: China's control over global supply 🔋 The top 10 #cobalt producing countries are set to account for 96% of total cobalt mined supply by 2030, with the DRC and Indonesia forecast to contribute 84% of this total production. 🔎 Benchmark data shows that Chinese companies will own over half of the cobalt production in the DRC and Indonesia, as well as 85% of the output from Papua New Guinea.   This will give Chinese companies command of 46% of global cobalt mined supply by 2030. ⬇️ Our infographic with Visual Capitalist utilises data from Benchmark’s Cobalt Forecast to visualise the significance of Chinese-owned mined cobalt production.

    ⛏️ Cobalt Infographic: China's control over global supply 🔋 The top 10 #cobalt producing countries are set to account for 96% of total cobalt mined supply by 2030, with the DRC and Indonesia forecast to contribute 84% of this total production. 🔎 Benchmark data shows that Chinese companies will own over half of the cobalt production in the DRC and Indonesia, as well as 85% of the output from Papua New Guinea.   This will give Chinese companies command of 46% of global cobalt mined supply by 2030. ⬇️ Our infographic with Visual Capitalist utilises data from Benchmark’s Cobalt Forecast to visualise the significance of Chinese-owned mined cobalt production. Read more on Benchmark Source: https://lnkd.in/e4jaSC9s Contact us for more information on Benchmark's Cobalt Forecast, Price Assessment and ESG Report ➡️ https://lnkd.in/dbhJvg6

    • Benchmark Cobalt Infographic - China's control over global supply
  • View organization page for Copperbelt Katanga Mining, graphic

    120,378 followers

    Exciting Opportunity for Zambian Engineers and Managers! The New Zealand Government, through the Manaaki New Zealand Short Term Training Scholarships, is offering an exceptional 4-week Geothermal Energy Project Management course in Auckland, New Zealand, from February 10 to March 11, 2025. This program is tailored for professionals in the geothermal energy sector, combining classroom learning with hands-on fieldwork, including a field trip showcasing geothermal technology in action. Key topics covered will include: Geothermal Energy Fundamentals, Resource Development, Project, Management, Business Case Exercises. Zambian professionals with at least 5 years of relevant experience, basic computer literacy, and employer endorsement are encouraged to apply. This is an invaluable opportunity to enhance decision-making, project management, and risk management skills — crucial for managing Zambia's energy future. Applications are open now and close on November 11, 2024. We urge all eligible Zambians to seize this opportunity, as the knowledge gained can significantly contribute to addressing Zambia’s energy challenges. For more information and to apply, visit: https://lnkd.in/gEnSM7rE Or apply directly using this link: https://lnkd.in/gUGg9MTp If you have any questions, please email awardee@scgnz.org or contact our First Secretary-Education, Ms. Mweemba Hamaleka. Let’s take strides towards a more sustainable energy future for Zambia! @Amb. Dr. Elias Munshya HIGH COMMISSIONER FOR ZAMBIA High Commission of Zambia to Australia and New Zealand

    View profile for Amb. Dr. Elias Munshya, graphic

    Zambia’s High Commissioner to Australia and New Zealand

    Exciting Opportunity for Zambian Engineers and Managers! The New Zealand Government, through the Manaaki New Zealand Short Term Training Scholarships, is offering an exceptional 4-week Geothermal Energy Project Management course in Auckland, New Zealand, from February 10 to March 11, 2025. This program is tailored for professionals in the geothermal energy sector, combining classroom learning with hands-on fieldwork, including a field trip showcasing geothermal technology in action. Key topics covered will include: Geothermal Energy Fundamentals, Resource Development, Project, Management, Business Case Exercises. Zambian professionals with at least 5 years of relevant experience, basic computer literacy, and employer endorsement are encouraged to apply. This is an invaluable opportunity to enhance decision-making, project management, and risk management skills — crucial for managing Zambia's energy future. Applications are open now and close on November 11, 2024. We urge all eligible Zambians to seize this opportunity, as the knowledge gained can significantly contribute to addressing Zambia’s energy challenges. For more information and to apply, visit: https://lnkd.in/gEnSM7rE Or apply directly using this link: https://lnkd.in/gUGg9MTp If you have any questions, please email awardee@scgnz.org or contact our First Secretary-Education, Ms. Mweemba Hamaleka. Let’s take strides towards a more sustainable energy future for Zambia! Dr. Elias Munshya HIGH COMMISSIONER FOR ZAMBIA High Commission of Zambia to Australia and New Zealand #Zambia #GeothermalEnergy #EnergyManagement #ZambiaInNewZealand #EnergyForDevelopment #ManaakiScholarships #munshyadiplomaticdiary #ForeignAffairsZambia

  • View organization page for Copperbelt Katanga Mining, graphic

    120,378 followers

    Third Edition of the PwC Zambia Mining Report is now available. The report focused on policy changes that have been implemented over the years and their impact on the sector along with the associated risks and benefits, as well as the ambitious plans to ramp up copper production to three million tonnes per annum by 2031. Download a copy of the report here: https://ow.ly/ytiX50TMnOM

    View organization page for PwC Zambia, graphic

    25,358 followers

    Our Third Edition of the PwC Zambia Mining Report is now available. The report focused on policy changes that have been implemented over the years and their impact on the sector along with the associated risks and benefits, as well as the ambitious plans to ramp up copper production to three million tonnes per annum by 2031. Download a copy of the report here: https://ow.ly/ytiX50TMnOM

    • No alternative text description for this image
  • View organization page for Copperbelt Katanga Mining, graphic

    120,378 followers

    Third Edition of the PwC Zambia Mining Report is now available. The report focused on policy changes that have been implemented over the years and their impact on the sector along with the associated risks and benefits, as well as the ambitious plans to ramp up copper production to three million tonnes per annum by 2031. Download a copy of the report here: https://ow.ly/ytiX50TMnOM

    View organization page for PwC Zambia, graphic

    25,358 followers

    Our Third Edition of the PwC Zambia Mining Report is now available. The report focused on policy changes that have been implemented over the years and their impact on the sector along with the associated risks and benefits, as well as the ambitious plans to ramp up copper production to three million tonnes per annum by 2031. Download a copy of the report here: https://ow.ly/ytiX50TMnOM

    • No alternative text description for this image

Similar pages