The three companies of the Group contributed to the renovation of this modern and sustainable facility. In the years that we have been involved with design and construction management, we have always had the goal of bringing to the City a facility that is both modern and sustainable, capable of attracting citizens from a wide range of generations and interests, and providing services that make it available 365 days a year to its citizens.
The new Stadio dei Pini in Viareggio developed on a surface area of 25,000 square meters, with 3,800 seats, now looks like a renovated, modern and sustainable facility. The integrated design and construction management for the new facility was carried out by Giuseppe De Martino, Technical Director of Sportium , together with Progetto CMR and STAIN ENGINEERING S.R.L., an engineering company in the MEP field, which signed the facilities design part. All companies under the Progetto CMR International holding. The design is aimed at dialogue with the surrounding natural environment, and through the use of selected materials and colors, the structure now blends into the pine forest landscape. Attention to sustainability permeates every aspect of the project. In particular: the grandstands were covered to allow for the installation of a photovoltaic panel system, and LED lighting. The outcome is an energy-efficient building capable of making the site near-zero energy balance, NZEB (Nearly Zero Energy Building). #viareggio #newproject #stadio leonardo salvemini Anxhelo Neli #sportium #stainengineering #progettocmr #progettocmrinternational
-
-
-
-
-
+ 12