• News
  • City News
  • mumbai News
  • Mumbai's first underground metro line to launch on July 24: All about the route, stations, and timings

Mumbai's first underground metro line to launch on July 24: All about the route, stations, and timings

Launching July 24, Mumbai's Aqua Line underground metro, spanning 33.5 km from Colaba to SEEPZ, will enhance commuting. Managed by MMRC, the Rs 37,000 crore project includes 27 stations. Operating 6.30am-11.00pm, with frequent trains reaching 90 km/h, it shortens travel to 50 minutes. DMRC ensures passenger safety. Full completion is projected in eight months.
Mumbai's first underground metro line to launch on July 24: All about the route, stations, and timings
Mumbai's Aqua Line metro, launching July 24, covers Colaba-Bandra-SEEPZ over 33.5 km with 27 stations to ease commutes. Running from 6:30 am to 11:00 pm, trains reach 90 km/h
MUMBAI: Mumbai's first underground metro line, the 'Aqua Line' (Colaba-Bandra-SEEPZ), will start operations on July 24, aiming to ease the daily commute for the city's residents.
BJP national general secretary Vinod Tawde made the announcement on social media, highlighting the significant benefits of the 33.5 km route from Aarey Colony to Bandra-Kurla Complex (BKC).
1x1 polls

“PM Narendra Modi had given the guarantee that Mumbaikars' lives will be made smooth, which is now going to be fulfilled,” Tawde shared on X.

The Aqua Line, which will greatly reduce traffic congestion, spans 33.5 km and houses 27 stations. The project, overseen by the Mumbai Metro Rail Corporation (MMRC), has seen an investment of over Rs 37,000 crores. Out of the 27 stations, 26 are underground.
The list of stations includes
  • Cuffe Parade
  • Vidhan Bhavan
  • Churchgate
  • Hutatma Chowk
  • CST Metro
  • Kalabadevi
  • Girgaon
  • Grant Road
  • Mumbai Central Metro
  • Mahalaxmi
  • Science Museum
  • Acharya Atre Chowk
  • Worli
  • Siddhivinayak
  • Dadar
  • Sitaladevi
  • Dharavi
  • BKC
  • Vidyanagari
  • Santacruz
  • Domestic Airport
  • Sahar Road
  • International Airport
  • Marol Naka
  • MIDC
  • SEEPZ
  • Aarey Depot

Metro services will operate from 6.30am to 11.00pm, with frequent train arrivals. Trains will reach speeds up to 90 km/h, reducing a typically two-hour road journey to just 50 minutes by metro.

The Delhi Metro Rail Corporation (DMRC) will manage the operation and maintenance of the Aqua Line, including the operation control centre, depot control centre, stations, running of trains, and maintenance of all metro infrastructure to ensure passenger safety. The contract with DMRC is set for ten years.
While the first phase launches this month, the entire project, including the second tunnel phase, is expected to be completed within the next eight months, promising further improvements to Mumbai's transportation system.
author
About the Author
Gopal Keshav

Gopal Keshav is a dedicated journalist based in Delhi, working for The Times of India. With a Bachelor's Degree in Journalism and Mass Communication, Keshav has a deep passion for politics, international relations, and sports.You can connect with him on X (formerly Twitter) @jayesh_k06

End of Article
FOLLOW US ON SOCIAL MEDIA
  翻译: