Connelly & Wicker | PRIME AE reposted this
Check out these photos from the completed Military Installation in the Midwest for American Water! This project provides American Water with a permanent operations center on base to efficiently provide a safe and sustainable drinking and wastewater system. In a great showcase of our collaborative disciplines, PRIME AE provided architecture, civil, structural, MEP, design, engineering, estimating, and construction administration services. The new building is a Pre-Engineered Metal Building given the tight project budget, but customized to complement the surrounding architecture, given the design-guidelines of the base. These unique customizations include exterior colors, arched entrance canopy, and stonework that reflect the design elements of the older, pre-existing buildings.