Andrew P., the Company’s President and CEO, stated, “Drilling is now underway on what is poised to be a very consequential program as we look to grow and de-risk our mineral inventory. With 50 drillholes planned over the next 5 months this is our most aggressive campaign in two years. In-fill drilling, on 25-metre centers, is anticipated to convert inferred resources located in the shallower portions of the Bermuda and Merten vein systems into measured and indicated resources, both systems projected to be the first structures encountered in a conceptual mining plan. Expansion drilling is targeting prospective mineralization in a gap along the vein corridor that spans 1,000-metres. Drilling is anticipated to link up our DPB and NW Step-out resource areas together.” Read news: https://lnkd.in/g8yeM6pD
Exciting times!
Sales Manager Harris Exploration Drilling division of Earth Drilling U.S.
3moWould love to get a shot at your work sometime.