BIM Coordinators job is NOT only tools, processes, and checking. It's constant communication with the design team: • Understanding bottlenecks, • Knowing who are decision-makers, • Finding out what can be improved through trial and error process 𝗪𝗶𝘁𝗵𝗼𝘂𝘁 𝗴𝗼𝗼𝗱 𝗰𝗼𝗺𝗺𝘂𝗻𝗶𝗰𝗮𝘁𝗶𝗼𝗻, 𝘄𝗲 𝗰𝗮𝗻'𝘁 𝗱𝗲𝗹𝗶𝘃𝗲𝗿 𝘁𝗵𝗲 𝗯𝗲𝘀𝘁 𝗼𝘂𝘁𝗰𝗼𝗺𝗲𝘀. And communication often starts during the meetings. So today I would like to recall one super important aspect of our work - Running coordination meetings. Good Coordination Session vs. Bad One. There is a very thin line between both. Avoid these 5 mistakes, and most likely, your next meeting won't be a disaster. 💥 😉 Next Tuesday, I 𝗿𝘂𝗻 𝗮 𝗙𝗥𝗘𝗘 𝗦𝗲𝘀𝘀𝗶𝗼𝗻, sharing my insights about the process of becoming a BIM Coordinator. Interested? Join us 👉 https://lnkd.in/dNBtPVAw

Javier Pacheco Pereda

BIM Consultant at ZECH Bau Holding GmbH

5mo

All of those happen every single meeting, until you just wish Flanders was dead.

Like
Reply
Lawrence Chapman

Lead Information Manager at HS2 (High Speed Two) Ltd

5mo

Review should also be driven from the coordination model and not driven by PowerPoint

Vanessa D. Acosta R.

Civil Engineer | Steel Structures Specialist | Tekla Structures Modeler & Detailer | AutoCAD Structural Drafter | Proyectista & Delineante de Estructuras Metálicas | Modelador BIM

5mo

Mistake number 2 is more common than you think, for example in my position as a checker, I have sometimes been non-invited to these meetings because of course, it is not my work to make decisions but it is to be aware of all the decisions, arrangements, agreements, design changes, etc, that had made between the different parties of the process to can be aware of what I have to check later, and sometimes the bim coordinator relay in the modeler to communicating me what are they had done but doesn´t happen always, so like you said communication it's important therefore the participation of the different roles that are involved in the process as well has to be a must as well to may guarantee the best outcome.

Nilas Louv

Ingénieur Génie civil/Architecture/ structures Mixtes

5mo

Interesting, let's find out more,

Like
Reply
Marciano Tonatto

Simplifico a coordenação BIM com você.

5mo

Error 5 is really compromising. Creating and directing issues in SMART format is a challenge. Those who create are usually doing it in a hurry and just want to feel that "I registered one more issue". However, when it is taken for resolution by the person in charge, the doubts of what, with whom, where and when begin to appear

Like
Reply
Jagseer Singh

Sr. BIM Modeler - Electrical/Firefighting Revit BIM modeler | Parametric Family creation | Scan to BIM | CAD to BIM | PDF to BIM | Lighting Design | Cost Segregation

5mo

These are valuable tips, thanks for sharing your experience with us. We will like to hear more from you.

Like
Reply
Nohier ElSamny

BIM-centric Digitalization & Management | Architect | MSc Constr. Proj. Mgmt | 15 yrs of BIM/VDC | Lean Agile Constr. | Information Mgmt | R&D | Keynote Speaker | Meta-Life Coach | Psychological Consultant | NLP | APG

5mo

An absolute fact...