Filia Dredging’s Post

View organization page for Filia Dredging, graphic

423 followers

TSHD Willem Sr closed 2023 with a maintenance dredging campaign in the Ferry Port of Breskens. Approximately 185,000 tonnes dry solid was removed in and in front of the ferry port. With this, Filia Dredging completed the dredging campaign for Rijkswaterstaat on behalf of the main contractor Beens Dredging (Beens Groep). The ferry port of Breskens is used by the Westerschelde Ferries. Every year, approximately 500,000 pedestrians and cyclists use the ferries as a link between Zeeuws-Vlaanderen and Walcheren.

  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
Rob Augustijn

Sales engineer marine

9mo

Ha wat grappig. Een tijdje geleden maakte ik al een foto van de Willem sr die in Breskens aan het werk was.

  • No alternative text description for this image
Like
Reply

Mooie klus!

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics