We're pleased to report results from the maiden grade control drilling program at the Kiaka South pit at our Kiaka Gold Project in Burkina Faso. Kiaka South is located 700m from the Kiaka Main pit, and is set to deliver higher grade mill feed in first 18 months of production. Thick zones of high-grade near surface mineralisation have been intercepted (multiple ending in mineralisation) including: ✅ 22m at 7.6 g/t gold ✅ 26m at 5.8 g/t gold ✅ 26m at 5.6 g/t gold ✅ 28m at 4.8 g/t gold ✅ 11m at 11.6 g/t gold ✅ 9m at 13.8 g/t gold Pre–production grade control drilling activities continue at Kiaka Main with further results imminent. Read the full ASX release here: https://loom.ly/dAtG_po
We are the source manufacturer of ceramic slurry pumps. The cost is low and the service life is 6 times that of traditional metal materials. We look forward to cooperation.
Des avancées spectaculaires
Great GC outcome combined with appropriate opportunity actions.
Formidable
Des avancées spectaculaires
Fantastic update!
Une croissance impressionnante !
Une croissance impressionnante !
Bonne nouvelle!
Supervisor Senior at Sila Équipement and BTP
1moCongratulations, I look forward to being part of this great team to demonstrate my skills in the field of drilling in general.