Welcome back to - Detail of the Week! In partnership with Detail Library and Emma Walshaw
This week's detail concerns a insulated foundation system junction with masonry cavity wall (ring beam supporting outer leaf).
Detail Break Down
* EPS insulation profile / grade, reinforcement and fill material specification are shown indicatively only and are to be designed to suit project specific loadings / conditions.
* All foundations should be designed by an engineer - all details subject to project specific requirements.
* External wall to meet min. U-Value 0.18 w/m²K.
* Ground wall typically achieves 0.10 W/m²K U-Value, dependant on perimeter/area value.
* Insulation thickness and specification based on project requirements.
Sign up to detail library (Detail-library.co.uk) with the following code: CIATaspiration for 15% off an annual subscription (applicable to annual memberships only)
Please note - The details shown provided are the property of the Detail Library and are to be used for educational purposes only, CIAT aspiration is not responsible for any errors, omissions, or issues arising from the use of this information. Please consult with the relevant chartered professionals, to ensure accuracy and compliance with building standards.
----------------------------------------------------
We are aspiration - aspiration is a forward-thinking and inclusive global community of members and affiliates, made up of students, graduates, Associates, affiliates, and recently qualified Chartered Architectural Technologists. 🌟
The initiative was established both to support aspiring professionals and to help shape the future of the profession. Connect with us now and get involved with Aspiration! #CIAT #GetInvolvedNow 🚀