Connor has been the Project Manager at Chelsea Embankment, right in front of the Royal Hospital with its many events including the Flower Show. Along with the complex engineering, the site finish incorporated intricate brickwork and has seen high-profile visits including Royals. Watch our latest People Behind the Tunnel video here: https://lnkd.in/ew6fVptw
Tideway London
Construction
London Bridge, London 43,434 followers
We're building the #SuperSewer for future generations and reconnecting London with the River Thames
About us
Tideway's Super Sewer is upgrading London's infrastructure to cope with demands well into the 22nd century and reconnecting the city with the iconic River Thames. The Thames Tideway Tunnel is a 25 kilometre interception, storage and transfer tunnel running up to 65 metres below the river. Starting in west London, the main tunnel generally follows the route of the River Thames to Limehouse, where it then continues north-east to Abbey Mills Pumping Station near Stratford. There it will be connected to the Lee Tunnel, which will transfer the sewage to Beckton Sewage Treatment Works. Overflows of untreated sewage into the River Thames add up to tens of millions of tonnes every year. London's sewerage system relies on an integrated network of combined sewer overflows (CSOs). At the time it was built, the CSOs would release flows through discharge points along the river during heavy storms. Originally, this would happen once or twice a year, it now happens on a weekly basis and no longer requires a storm to trigger overflows. By intercepting the sewage before it enters the river, the Thames Tideway Tunnel will help prevent the River Thames from being polluted with untreated sewage which can stay in the river for up to three months before the ebb and flow of the tide finally takes it out to sea. For more information, visit our website www.tideway.london Tideway Inclusive Recruitment statement: We are one of The Times Top 50 Employers for Women, a Stonewall Diversity Champion, a proud signatory of the ‘Ban the Box’ campaign, and Disability Confident Committed Employer. We pride ourselves on providing employment for disabled employees, providing support and adjustments during the recruitment process, and wherever needed in the working environment. We offer a guaranteed interview scheme for suitably qualified disabled applicants.
- Website
-
http://www.tideway.london
External link for Tideway London
- Industry
- Construction
- Company size
- 501-1,000 employees
- Headquarters
- London Bridge, London
- Type
- Privately Held
- Specialties
- Waste water services, engineering, civil engineering, and infrastructure
Locations
-
Primary
110 Southwark Street London
6th Floor Blue Fin Building
London Bridge, London SE1 0SU, GB
Employees at Tideway London
-
Stuart Grant
Commercial Project leader/Director for complex infrastructure projects. Chartered Civil Engineer.
-
John Sage
Head of Corporate Responsibility at Tideway and Trustee at London Youth Rowing
-
Natalia Jones, MBA
Major Projects | Programme Management | Transformation | Strategy | Compliance | Stakeholder Management | Sustainability
-
ParvezAhmad Shaikh
Head of Planning at Thames Tideway/ Planning Expert Jacobs
Updates
-
#SuperSewer update🚧 ✅We officially started soft landscaping works at Blackfriars with the planting of our first semi-mature trees around the site ✅At King Edward Memorial Park the team is making good progress removing the cofferdam sheetpiles ✅At Earl Pumping Station, the shaft exterior tiled cladding is nearly complete
-
Supernatural super sewer? Happy Halloween 🎃 from Tideway London 👻
-
Tideway London reposted this
How can mental wellbeing be improved in construction and engineering workplaces? The construction and engineering industry gathered to tackle mental health at work during October’s Make A Difference Summits MAD World Construction Summit. The conversation reinforced the need for bottom-up as well as top-down approaches. Ledetta Asfa-Wossen reports with insights from Steve Hails, director of business services and health, safety and wellbeing at Tideway London, Kris Kelly, head of HSEQ and support services at ADT Workplace, Joanne Pigram FCIM Chartered Marketer, head of marketing and social value at Danaher & Walsh Group Ltd, Luke Mason-Hobbs, social value consultant at Mott MacDonald, and Danny Clarke, head of engagement at the Construction Industry Training Board (CITB). https://lnkd.in/e-gtqvxh #MADsummit #mentalhealth #construction
-
ICYMI❗The Tideway London project is featured in a news-style programme The Future of Investing produced by ITN Business. The programme shows how the investing landscape is undergoing rapid transformation as individuals and businesses grow increasingly aware of the investment community's role in driving societal improvements. Visit the ITN Business Hub to watch the full programme and our film here: https://ow.ly/OkgJ50TIHFe
-
🌳 Park in Wandsworth reopens 🎥 In our latest video, watch as a celebration of the work above and below ground was held at King George's Park, an area used to build London’s #SuperSewer. Click here for the full video: https://lnkd.in/eCQ7-krA
-
#SuperSewer update🚧 ✅At Blackfriars Bridge Foreshore, progress has been made on the reinstatement of the paving on the southern down ramp ✅At Carnwath Road, the concrete pours have been completed to the Whiffin Wharf area of the site ✅At King Edward Memorial Park, a 30-tonne precast beam has arrived for the inter-tidal terracing
-
Tideway London reposted this
This week, we were pleased to host the Environment Secretary Steve Reed MP at Tideway London's Albert Embankment site as part of his media round for the Government’s important announcement on a review of the water sector.
-
❗ICYMI❗ Last week we announced that the first 4 of 21 sites have been switched on, and how the new tunnel is starting to protect River Thames from sewage pollution for the first time. First data records show that half a million cubic metres of sewage was captured by the tunnel network in a 24-hour period. Learn more here: https://ow.ly/nlIa50TQtHl