Welcome 2025 🎉 In our latest #TunnelVision we look back at a huge 12 months on the Tideway London project when the #SuperSewer was switched on, protecting the River Thames for the first time, while we also opened up new public spaces. Watch the full episode here: https://lnkd.in/e4mYXDti
Tideway London
Construction
London Bridge, London 43,668 followers
We're building the #SuperSewer for future generations and reconnecting London with the River Thames
About us
Tideway's Super Sewer is upgrading London's infrastructure to cope with demands well into the 22nd century and reconnecting the city with the iconic River Thames. The Thames Tideway Tunnel is a 25 kilometre interception, storage and transfer tunnel running up to 65 metres below the river. Starting in west London, the main tunnel generally follows the route of the River Thames to Limehouse, where it then continues north-east to Abbey Mills Pumping Station near Stratford. There it will be connected to the Lee Tunnel, which will transfer the sewage to Beckton Sewage Treatment Works. Overflows of untreated sewage into the River Thames add up to tens of millions of tonnes every year. London's sewerage system relies on an integrated network of combined sewer overflows (CSOs). At the time it was built, the CSOs would release flows through discharge points along the river during heavy storms. Originally, this would happen once or twice a year, it now happens on a weekly basis and no longer requires a storm to trigger overflows. By intercepting the sewage before it enters the river, the Thames Tideway Tunnel will help prevent the River Thames from being polluted with untreated sewage which can stay in the river for up to three months before the ebb and flow of the tide finally takes it out to sea. For more information, visit our website www.tideway.london Tideway Inclusive Recruitment statement: We are one of The Times Top 50 Employers for Women, a Stonewall Diversity Champion, a proud signatory of the ‘Ban the Box’ campaign, and Disability Confident Committed Employer. We pride ourselves on providing employment for disabled employees, providing support and adjustments during the recruitment process, and wherever needed in the working environment. We offer a guaranteed interview scheme for suitably qualified disabled applicants.
- Website
-
http://www.tideway.london
External link for Tideway London
- Industry
- Construction
- Company size
- 501-1,000 employees
- Headquarters
- London Bridge, London
- Type
- Privately Held
- Specialties
- Waste water services, engineering, civil engineering, and infrastructure
Locations
-
Primary
110 Southwark Street London
6th Floor Blue Fin Building
London Bridge, London SE1 0SU, GB
Employees at Tideway London
-
Stuart Grant
Director of Commercial Agreements & Property, Tideway
-
John Sage
Head of Corporate Responsibility at Tideway and Trustee at London Youth Rowing
-
Natalia Jones, MBA
Major Projects | Programme Management | Transformation | Strategy | Compliance | Stakeholder Management | Sustainability
-
ParvezAhmad Shaikh
Head of Planning at Thames Tideway/ Planning Expert Jacobs
Updates
-
🎥 Ola has been a Traffic and Logistics Manager on the eastern section of the Tideway London project. In addition to moving large amounts of material and equipment by river, Ola's role involved looking after the movement of a wide range of vehicles on the highway including the transport of the massive 600-tonne Tunnel Boring Machine Annie to Greenwich Pumping Station at night. Watch our latest People Behind the Tunnel here: https://lnkd.in/eXyY26G5
-
#SuperSewer update🚧 ✅At Carnwath Road, coring has been completed and balustrade installation is progressing ✅At Putney Embankment, the Combined Sewer Overflow riser connection welds have been completed ✅At King Edward Memorial Park, the soft landscaping has commenced
-
Tideway London reposted this
📢Calling all aspiring female ICE fellow - join us at our hybrid event in person in Cardiff and online globally next month. ICE Connects: growing the Women in Fellowship network 15: 30 GMT Thursday, 27 February. Hosted by Michѐle Dix FICE, the panel includes Chaido (Yuli) Doulala-Rigby CEng FICE chief engineer Tensar International Limited and Andy Mitchell CBE , CEO Tideway London. For further information or to book your place go to: https://lnkd.in/eERQgW3J #WomenInSTEM #CivilEngineering
-
Tideway London reposted this
Last night we were joined by representative speakers from Tideway London and Costain Group PLC in a dinner event, chaired by Lord Moylan. Attendees discussed how the UK can overcome barriers to efficient major infrastructure projects and remain globally competitive. For more information on future IPT events, visit our website at: https://lnkd.in/eXfiGau. #IPTInfrastructure
-
#SuperSewer update🚧 ✅At Kirtling Street, the mooring piles were reinstated for Nine Elms Pier ✅At Carnwath Road, installation of the balustrade has started on the riverwall ✅At Earl Pumping Station, the architecture and landscaping on the brown roof is taking shape
-
The Tideway London #SuperSewer has been included in a Time Out list of "8 huge developments that will change London in 2025". You can read here: https://lnkd.in/ezgXWZHw
-
Henrietta has been a Communications Manager on Tideway London overseeing branding, campaigns, and engaging staff, having previously worked in advertising and art education. Bringing the story of the Super Sewer to life has included creating an undergound garden in the tunnel and a live cello performance 60 metres below Chambers Wharf. Watch our latest People Behind the Tunnel here: https://lnkd.in/ecmpUawV
-
Festive rewind 🎇🕰️ Happy New Year from all at Tideway London
-
Breaking News❗New video footage found in the #SuperSewer 📹 Ahead of Christmas, a SnowPro camera was recovered from inside the tunnel, with some magical video inside. To all our followers and everyone working on the #SuperSewer, Merry Christmas 🎄